Rahab Consulting Engineers

  • Home
  • Projects
  • Email
  • Contact Us
  • Projects -> Tunnel
| | Language |
  • Home Page
  • Projects
  • Board Of Directors
  • Organization Chart
  • Awards
  • Download
  • Contact Us

Tunnel



Bafgh - Bandar Abbas Railway (2th part) Tunnels (2250 m)

Fahraj- Chabahar Railway (4th part) Tunnels (1760 m)

Miane- Tabriz Railway (8th-A part) Tunnels (3440 m)

Miane- Tabriz Railway (8th-B & 9th parts) Tunnels (250 m)

Miane- Tabriz Railway (10th part) Tunnels (2785 m)

Hemmat Freeway (22 Precinct) Tunnels (240 m)

Hemmat- Karaj Freeway Tunnels (460 m)

Toure Tunnel in West Railway of Country (756m)

Kavar- Firuzabad Highway Tunnels (3410m)

Northern Hemmat Freeway Tunnels (560 m)

Projects

  • Railway
  • Road & Highway
  • Bridge & Structure
  • Tunnel
  • Oil & Gas
  • Architect & Urban Design
  • Hydrology
  • Mine
  • HSE

Head Office

  • No.28, Esfandiar St., Valiasr Ave., Tehran, Iran
  • Tel: 88781185، 88781703، 88783320
  • Fax: 88786936
  • P.O Code: 1968654194

Our services

  • Steel & Concrete Bridge Design
  • Road & Railway Design
  • Intersection Design
  • Oil & Gas Pipe Design
  • Architect & Urban Design
  • Tunnel & Undergroung Structure Design
  • Hydrology Studies
  • HSE
  • Geotechnic & Geology
  • Value Engineering

Current Project

  • Hemat Freeway
  • Karaj Intersections
  • Shooshtari Highway
  • Miyane - Tabriz Railway
  • Fahraj - Chabahar Railway
Copyright © 2012 RAHAB Cons. Engrs. | Designed by LiNDGroup